RAAC Remediation in West Sussex

West Sussex has 4 buildings with confirmed RAAC on the public record, covering hospitals, public buildings. Structured Carbon strengthens RAAC in place with bespoke CFRP, so buildings in West Sussex can stay open and avoid full replacement.

Schedule an Inspection

Confirmed RAAC buildings in West Sussex

Hospitals and NHS sites (3)

Other public and cultural buildings (1)

These buildings were publicly identified by the Department for Education, the Department of Health and Social Care, NHS England and public records. We list them to show the scale of the RAAC challenge and where strengthening can help, not to imply Structured Carbon has worked on every one.

Strengthening, not replacement, in West Sussex

The default response to RAAC, prop the area, take it out of use and plan replacement, is the slowest and most expensive route there is. For the schools, healthcare and public buildings of West Sussex that often means closures, decant and a multi-year programme. In-place CFRP strengthening keeps the building safely in use, at a fraction of the cost and time of replacement.

The RAACSafe™ Protocol

Wherever a structural assessment supports it, we strengthen RAAC in place rather than strip it out, following our five-stage RAACSafe™ Protocol: Assess, Design, Manufacture, Install and Monitor. Neil Smuts surveys and assesses the RAAC, John Staves designs a bespoke CFRP strengthening scheme to the exact capacity required, the CFRP is manufactured in the UK to that design and installed in place, and the strengthened structure is monitored. Across the RAAC tenders we cost, a bespoke CFRP scheme engineered for that exact roof frequently comes in at well below 15 per cent of the cost of full replacement. On one tender, a roof costed at around £40 million to replace was priced for strengthening at under £4 million, with no decant and a programme measured in months rather than years.

Engineered by named RAAC specialists

Every scheme is designed and signed off by John Staves (CEng FIStructE), one of the UK’s most highly regarded RAAC structural engineers, working from the survey, scanning and monitoring of Neil Smuts (MCIOB, MInstNDT), President of the UK Concrete Scanning Standard. Meet the team.

RAAC across West Sussex sectors

Related pages

Frequently asked questions

Can RAAC in West Sussex be strengthened instead of replaced?
In most cases, yes. Where a structural assessment supports it, RAAC in West Sussex can be strengthened in place with bespoke CFRP, keeping the building open and avoiding the cost and disruption of replacement.
Which buildings in West Sussex have confirmed RAAC?
The publicly identified buildings in West Sussex are listed on this page, drawn from the Department for Education, NHS and public records. Many more buildings of the same era may contain RAAC and warrant checking.
Who designs RAAC strengthening for West Sussex buildings?
Every scheme is designed and signed off by John Staves (CEng FIStructE), a recognised RAAC structural engineer, working from the survey and monitoring of Neil Smuts (MCIOB, MInstNDT), President of the UK Concrete Scanning Standard.
How much does RAAC remediation cost in West Sussex?
Across the RAAC tenders we cost, a bespoke strengthening scheme tailored to that exact roof frequently comes in well below 15 per cent of the cost of replacement. On one tender, a roof costed at around 40 million pounds to replace was priced for strengthening at under 4 million pounds. We scope each West Sussex building individually, from the survey and structural assessment.

RAAC in your building or estate?

Tell us about the building and any survey already done, and our named RAAC specialists will advise whether strengthening can keep it open and avoid replacement.

Schedule an Inspection